Step 1
Tools required

Step 2
Acclimatise the panels to the room in which they will be laid for 48 hours prior to installation at a temperature of 15-30⁰°C and a relative humidity of 40-70%.

Step 3
Plan out panel installation to reduce waste.

Step 4
Construct a batten frame.

Step 4a
Batten frame – living room

Step 4a2
Batten frame – wet room

Step 4b
Ensure adequate ventilation!

Step 4b2
Always fix the vertical battens first.

Step 5
Take the first panel 6a and nail in place or secure
with starter brackets.

Step 6a
Mount the remaining panels.

Step 6b
Install with either a zero joint (A) or visible joint (B).

Step 7
Secure the panels with our bespoke CL 3.6 K bracket (tip: use a nail to help you) or…

Step 8
… with a staple gun.

Step 9

Step 10a
Mark up the last panel…

Step 10b
…and cut it to size.

Step 10c
Slot into place.

Step 11
Attach edging.